<s id="k82sw"><acronym id="k82sw"></acronym></s>
<sup id="k82sw"><samp id="k82sw"></samp></sup>
<noscript id="k82sw"><table id="k82sw"></table></noscript>
  • <li id="k82sw"></li>
    <dfn id="k82sw"></dfn>
    国产无码久久,久久99视频,欧洲无码视频,国产免费AV网站,色诱久久,jjzz国产,国产亚洲成人网,橹橹色
    Hotline:400-880-1556

    English




    [Focus] Requirements and content of the new version of IEC 62619:2022, the energy storage battery standard

    Author:中認聯科 time:2022-08-09 Ctr:2979

    IEC Battery Technical Committee TC 21/SC 21A published the second edition of IEC 62619:2022 on 24 May 2022. Compared with the 2017 version, the detailed changes in the new version are shown in the table below. For changes to the new version, manufacturers need to pay special attention to the following changes, which need to be considered in the early design and development process:

    1. New requirements for moving parts;

    2. Additional hazardous live parts requirements;

    3. Additional battery system design requirements;

    4. Added system lock requirements;

    5. New EMC requirements;

    6. Additional laser triggers the spreading process.

    What's new in the new version

    新版新增.png 

    Modified content of the new version

    新版修改.png 

    The new version deletes the content

    新版刪除.png 

    Laser Triggered Spreading Process

    1. Cell preparation test

    (1) Fully charge the battery according to the method specified by the manufacturer

    (2) Place a thermocouple on the surface of the cell

    (3) Fixed cell

    (4) Determine the laser irradiation plan

    (5) Prepare equipment such as cell temperature measurement

    (6) Set the ambient temperature to 25℃±5℃

    (7) Irradiate the battery with a laser at a certain point and measure the temperature of the battery until the end of the observation

    (8) Turn off the laser when it is observed that the temperature rises rapidly due to the thermal runaway of the cell

    (9) Continue to observe the cell temperature and appearance until the temperature drops to a safe operating range

    (10) View temperature curve to confirm thermal runaway

    (11) The cell prediction shall be repeated 3 times, and if thermal runaway is confirmed in each test under the same conditions, the battery system spread test shall be carried out under the same irradiation conditions

    2. Battery system test

    (1) Fully charge the battery system according to the manufacturer's recommended conditions

    (2) Place a thermocouple on the surface of the cell

    (3) Fix the battery system on the test bench, and the irradiation point on the target cell should be the same or similar to that of the preliminary test

    (4) Prepare and set up equipment for battery system temperature test etc.

    (5) Determine the laser irradiation plan

    (6) Set the ambient temperature to 25 ℃ ± 5 ℃

    (7) Irradiate the target cell with a laser at a certain point and continuously measure the temperature of the monitored cell

    (8) When it is observed that the temperature rises rapidly due to the thermal runaway of the cell, turn off the laser

    (9) Observe and measure the cell temperature and the appearance of the battery system for at least 1 hour

    Warm Tips

    IEC 62619 is a safety standard for lithium secondary batteries used in industrial products. It is cited by power storage systems in many countries and regions and is the basic standard for battery systems in power storage system certification. If you want to know more about the requirements for battery product testing and certification or have battery products that need to be tested and certified, please feel free to contact us, our engineers will serve you as soon as possible!

    Related Articles
    • How long does it take to obtain the KC certification for drones? The process and required documents will be explained in one go.

    • Australia and New Zealand Market Access Code: Comprehensive Analysis of RCM Certification for Tablets

    • Essential for Market Entry in North America: Core Points of Battery UL Certification

    • Wireless router for export to Canada must have ISED IC certification: Comprehensive analysis

    Follow Us
    主站蜘蛛池模板: 九九成人免费视频| 亚洲av电影天堂| 精品人人妻| 亚洲爽爆av一区二区| 免费92淫黄看电影| 国产精品中文久久久久久久| 久久无码高潮喷水免费看| 7777久久亚洲中文字幕蜜桃| 国产午夜亚洲精品国产成人| 免费92淫黄看电影| 亚洲一区av无码少妇电影| 亚洲日韩在线中文字幕| 久久综合激情网| 国产av大全| 亚洲综合在线成人| 免费国产a国产片高清网站 | 色一乱一伦一图一区二区精品| 亚洲中文国产字幕| 激情宗合网| 精品国产美女| 亚洲天堂中文字幕天天码| 欧美亚洲国产精品久久久久| 亚洲乱码日产精品bd| 尤物在线91| 91chiese在线观看| 国产成人精品av| 精品九九在线| 在线精品自拍亚洲第一区| 中文字幕精品亚洲| 97亚洲狠狠色| 熟女中文字幕?在线| 自拍口爆| 熟女网址| 国产精品毛片在线完整版| 国产精品va| 欧美精品乱码99久久蜜桃| 欧美日韩美鲍| 男女性高爱潮免费网站| 人妻一区二区三区| 成人在线亚洲| 色欧美与xxxxx|