<s id="k82sw"><acronym id="k82sw"></acronym></s>
<sup id="k82sw"><samp id="k82sw"></samp></sup>
<noscript id="k82sw"><table id="k82sw"></table></noscript>
  • <li id="k82sw"></li>
    <dfn id="k82sw"></dfn>
    国产无码久久,久久99视频,欧洲无码视频,国产免费AV网站,色诱久久,jjzz国产,国产亚洲成人网,橹橹色
    Hotline:400-880-1556

    English




    Pay attention! The fourth edition standard IEC 62368-1: 2023 for audio/video, information technology and communication technology equipment has been published

    Author:中認聯科 time:2023-06-27 Ctr:1918

    On May 26th, 2023, the International Electrotechnical Commission (IEC) issued the IEC 62368-1:2023 (4th edition) standard. This standard specifies the safety requirements of electrical and electronic equipment (rated voltage not exceeding 600V) using audio, video, information technology and communication technology in the field of business and office machines (excluding the requirements of equipment performance or functional characteristics).

    The main technical contents of the new standard and IEC62368-1:2018 (third edition) are changed as follows:

    ◆ In section 4.1.1, delete "Accepting components and assemblies conforming to IEC 60950-1 or IEC 60065".

    It means that the fourth edition no longer accepts components or assemblies certified by IEC 60950-1 and IEC 60065.

    ◆ Chapter 4.1.8 updated the equipment/components applicable to pressurized LFC test G.15

    Delete "G.15 is not applicable to equipment with more than 1L liquid", which means that equipment with more than 1L liquid should also be evaluated.

    ◆ The test requirements for thermoplastic) T.8 have been added in 4.4.3.1 chapter.

    As a safety protection, the untouchable thermoplastic materials also need to do T.8 stress relief test, such as insulating sheets for internal insulation and isolation.

    ◆ Section 4.8 is added with inapplicable requirements including button cell equipment types and warnings.

    The updated section 4.8 is not applicable to the equipment that is unlikely to be taken out by children in button cell, but the relevant battery warning (4.8.2) is required.

    ◆ Chapter 4.8.3 updated the structural design requirements for button cell protective doors or covers.

    Chapter 4.8.3 adds a variety of acceptable structural design types.

    ◆ Chapter 4.10.3 added the requirements for the main power cord.

    It is clear that the power cord only needs to meet the requirements of G.7 power cord, and it is not necessary to use the power cord as an external cord to meet the requirements of Chapter 6, especially the fire protection requirements of the external cord in Chapter 6.5.

    ◆ 5.5.2.2 chapter has increased the requirements for plug discharge of industrial equipment.

    The plug discharge test of industrial equipment with Pluggable equipment type B was added, and the touchable voltage was not measured until 5 seconds later.

    ◆ 5.6.2.2 chapter updated the color requirements of grounding conductor.

    It is clear that the yellow-green color (wire) cannot be used for functional grounding unless it is a multi-purpose preassembled part.

    ◆ 6.2.3.2 chapter updated the test method of resistive PIS.

    The test method of resistive PIS is simplified. When the control fire spread method is used, except for the secondary lithium battery, the parts and conductors in the PS2 circuit are not considered as resistive PIS, and the PS3 circuit is all resistive PIS.

    ◆ Chapter 6.3.1 updated the parts for which the external material requirements of the fire enclosure are not applicable.

    Loudspeaker drivers, mesh cloth, foam, grid covering materials, etc. are added to the parts where the external material requirements of the fire-proof enclosure are not applicable.

    At the same time, relevant tests (the requirements are the same as UL60065) for mesh cloth, foam and grid covering materials that need to comply with Appendix S.6 have been added.

    ◆ Chapter 6.4.6 updated the requirements for controlling the flame spread in the PS3 circuit.

    Added that the distance between the varistor and the plastic shell is less than 13mm, and the varistor should meet the requirements of G.8.2, regardless of the fire rating of the shell.

    ◆ Chapter 6.4.8.3.4 updated the requirements for the opening at the bottom of the fire enclosure.

    It is added that flammable materials are unlikely to exist in the surrounding environment of professional equipment (for example, in data centers and server rooms). If the bottom surface of the fire enclosure meets the requirements of 6.4.8.3.4, the Extended bottom surface can be regarded as the applicable opening requirements of the fire enclosure as shown in Figure 44.

    防火外殼開孔要求.png 

    ◆ Chapter 6.4.8.3.5 updated the requirements for the opening on the side of the fire enclosure.

    The relationship between the lateral thickness and the opening of the fire-proof enclosure is added, which meets the requirements of the lateral opening as shown in Figure 45.

    防火外殼側面開孔.png 

    ◆ Chapter P.2.1 has updated the requirements for opening holes on the side of the foreign body proof shell.

    The dimension of the newly added opening on the side of the shell to prevent foreign objects from entering meets the requirements as shown in Figure P.3, and the maximum vertical height of the opening on the side is less than 11 times the thickness of the side of the shell.

    外殼側面開孔尺寸.png 

    ◆ Chapter 9.6 updated the requirements of wireless power transmitter.

    It is clear that the test requirements of wireless power transmitter are only applicable to planar transmitter, and if the transmitter is not planar, such as sloping, the test is not applicable.

    ◆ Chapter 9.6.3 updated the test method and qualification criteria.

    Modify the test method: 1). The foreign body should be fixed reliably during the test; 2). The four cycles of testing foreign bodies are done twice respectively. The first time, let the emitter work before releasing foreign bodies, and the second time, let the emitter work before releasing foreign bodies.

    The temperature limit value is relaxed.

    ◆ Section B.2.5 updated the judgment requirements for input test.

    The judgment of equipment powered by non-grid power supply has been modified, requiring that the current or power input for testing should not be greater than the rated value of the equipment.

    ◆ Chapter F.3.5.3 updated the requirements for fuse marking.

    It is clear under what circumstances the fuse needs the indicative safety protection and the marking elements of the indicative safety protection.

    ◆ Chapter F.3.6.2 updated the labeling requirements for Class II equipment with functional grounding.

    It is clear which Class II devices with functional grounding need to be marked with functional grounding symbols (IEC 60417-6092).

    接地符號.png 

    ◆ Chapter G.7.3 updated the requirements of non-detachable soft fixation and stress relief.

    It is clear that the interconnecting cable of ES2/ES3/PS3 circuit also needs to be tested for flexible cord stress relief.

    ◆ Chapter G.15 updated the test requirements for LFC.

    The requirements of Self-contained LFC and modular LFC have been added to deal with liquid cooling equipment larger than 1 liter.

    ◆ Chapter M.4 updated the applicable product categories.

    Deleting the word "portable device" means that the requirements of M.4 are also applicable to non-portable battery products, and the range of applicable devices is expanded.

    There are additional safety protection requirements when standing equipment with lithium battery is added.

    ◆ Chapter M.4.3 updated the test requirements for battery cell output PS.

    It is clear that the PS energy source needs to be evaluated for single cell or combined cell, and the fire-proof enclosure can be exempted only when the output is below PS1.

    Warm tips

    ZRLK has been focusing on the testing and certification of consumer electronic and electrical products for 18 years, always paying attention to the changes of laws and regulations in various countries, and providing customers with one-stop testing and certification services to ensure that your products enter the target market quickly. Our company has a professional technical team and rich experience in product testing, and can provide you with a test report that meets the requirements. If you need it, please feel free to contact us, and our engineers will serve you at the first time!

    Related Articles
    • How long does it take to obtain the KC certification for drones? The process and required documents will be explained in one go.

    • Australia and New Zealand Market Access Code: Comprehensive Analysis of RCM Certification for Tablets

    • Essential for Market Entry in North America: Core Points of Battery UL Certification

    • Wireless router for export to Canada must have ISED IC certification: Comprehensive analysis

    Follow Us
    主站蜘蛛池模板: 欧美乱妇高清无乱码免费| 欧洲一区二区三区| 在线a视频网站| 国产综合在线不卡九色| 成人三级片网站| 国产186区| 九九精品在线观看| 一区二区中文| 欧美喷潮最猛视频| 黄男女激情一区二区三区| 99久久国产综合精品女同| 中文字幕AV一区| 欲香欲色天天天综合和网| k频道国产在线观看| 日日噜噜噜夜夜爽爽狠狠视频 | 成人性生交大片免费卡看| 97超级碰久久久久香蕉人人| 中文字幕视频在线看| 亚洲色大成网站www永久男同| 海原县| 人妻无码久久一区二区三区免费| 免费vA片| 日本三级欧美三级人妇视频黑白配| 成人九九| 日本一区三区高清视频| 岛国大片视频在线播放| 在线播放深夜精品三级| 欧美 变态 另类 人妖| 俺去啦中文网| 无码专区男人本色| 国产精品高潮呻吟AV| 亚洲欧洲av无码专区| 91日韩在线| 国产va免费精品观看| 亚洲男人在线| 国产精品无码成人午夜电影| 日韩高清在线亚洲专区国产| 吉隆县| 无码伊人久久大杳蕉中文无码| 亚洲国产精品高清久久久| 99精品热6080yy久久|